What's your project topic?

| Back |

Building Project Topics & Research Materials | Final Year Research Project Topics With Free Chapter One

  • 1. THE USE OF BUILDING SURVEY FOR MAINTENANCE OF BUILDING IN NIGERIA

    » Abstract This research project present the use of building survey for maintenance of buildings. It used analytic model and field studies on improper building maintenance to discuss the causes and remedial measures to be used. It was discovered that low level of awareness about building survey is the major problem of our building maintenance (i.e carrying out maintenance programme without proper in...Continue Reading »

    Item Type: Project Material |  50 pages |  7,424 engagements | 

  • 2. CHALLENGES OF LOW COST HOUSING DELIVERY IN NIGERIA

    » CHAPTER ONE INTRODUCTION The world of building Industry is very wide and reach which covers all areas like production, Building maintenance, project management, project monitoring and evaluation, facilities and viability studies and building surveying etc.  and there is room in its for every person who want to learn, experience and practices to see above all how to provide good shelter for the g...Continue Reading »

    Item Type: Project Material |  50 pages |  7,369 engagements | 

  • 3. CONFLICT MANAGEMENT IN NIGERIAN CONSTRUCTION INDUSTRY

    » CHAPTER ONE INTRODUCTION Background of the study Today‘s construction projects become more complex in nature. The complex,relational and lengthy process of designing and building makes construction a process in which disputes are virtually ensured. Furthermore, the involvement of multidisciplinary in the construction project also leads toconflicts among the parties. It seems that conflict and di...Continue Reading »

    Item Type: Project Material |  50 pages |  8,296 engagements | 

  • 4. IMPROVING URBAN RESIDENTS AWARENESS OF THE IMPACT OF HOUSEHOLD ACTIVITIES ON CLI...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal...Continue Reading »

    Item Type: Project Material |  50 pages |  8,204 engagements | 

  • 5. MULTIVARIATE APPROACH TO BENCH MARKING QUALITY PREDICTION PARAMETERS IN BUILDI...

    » CHAPTER ONE 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  0 engagements | 

  • 6. MULTIVARIATE APPROACH TO BENCH MARKING QUALITY PREDICTION PARAMETERS IN BUILDIN...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  6,431 engagements | 

  • 7. AN APPROACH TO APPLICATION OF TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE O...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective interna...Continue Reading »

    Item Type: Project Material |  50 pages |  8,317 engagements | 

  • 8. EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,485 engagements | 

  • 9. A COMPARATIVE STUDY OF THE ENTREPRENEURIAL CHARACTERISTICS OF ARCHITECTURE AND ...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,244 engagements | 

  • 10. IMPORTANCE OF INCENTIVES IN ENHANCING WORKERS PERFORMANCE IN CONSTRUCTION INDUST...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  6,468 engagements | 

  • 11. AN APPROACH TO APPLICATION OF TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE O...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,332 engagements | 

  • 12. PARADIGM FOR TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE OPERATION

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,388 engagements | 

  • 13. MANAGING RETENTION IN RESIDENTIAL BUILDING PROJECTS

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,483 engagements | 

  • 14. MULTI-PARAMETER OPTIMIZATION OF COST ENTROPY FOR REINFORCED CONCRETE OFFICE BUIL...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,060 engagements | 

  • 15. COMPARATIVE ANALYSIS OF INCENTIVES PROVISION IN FOREIGN AND INDIGENOUS FIRM AND ...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,550 engagements | 

  • 16. THE IMPACT OF INSURANCE POLICIES TO BUILDING PROJECT CONTRACTS

    » CHAPTER ONE INTRODUCTION 1.1 Background of Study A clear understanding of risk management process and practice within the construction industry is an important model for exploring the application and barriers of risk management in Nigeria. It will also help in identifying the ever present risk factors and their probability of occurrence in Nigerian projects. This chapter summarizes the whole work ...Continue Reading »

    Item Type: Assignment |  50 pages |  9,551 engagements | 

  • 17. THE IMPACT OF CONSTRUCTION INDUSTRY IN THE DEVELOPMENT OF NIGERIA

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  5,947 engagements | 

  • 18. FACTORS AFFECTING WORKERS PRODUCTIVITY IN BUILDING PRODUCTION PROCESS

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  6,504 engagements | 

  • 19. EFFECTIVE MATERIAL MANAGEMENT IN BUILDING CONSTRUCTION SITE

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal...Continue Reading »

    Item Type: Project Material |  50 pages |  7,149 engagements | 

  • 20. PROJECT PLANNING AND PROGRAMMING AS TOOLS FOR EFFECTIVE PROJECT DELIVERY

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal ...Continue Reading »

    Item Type: Project Material |  50 pages |  6,500 engagements | 

  • 21. SAFETY MANAGEMENT IN BUILDING CONSTRUCTION SITE

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  6,017 engagements | 

  • 22. PLANT RESOURCE CONTROL AS AN EFFECTIVE TOOL TO PROJECT DELIVERY IN BUILDING INDU...

    » CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control 2.2 Factors that characterize effective internal c...Continue Reading »

    Item Type: Project Material |  50 pages |  5,831 engagements | 

  • 23. IMPORTANCE OF INCENTIVES AND MOTIVATION OF HUMAN ELEMENT IN CONSTRUCTION INDUSTR...

    » Abstract This work examine the importance of incentives and motivation of human element in construction industry, a case study of construction industries in Abuja, Nigeria. The research objective and question were formulated to guide this work, descriptive research design was adopted and the five construction industries in Abuja were randomly selected for this research work and appropriate questio...Continue Reading »

    Item Type: Project Material |  50 pages |  5,842 engagements | 

  • 24. LABOUR PRODUCTIVITY ANALYSIS USING MULTI-VARIABLE LINEAR REGRESSION TECHNIQUE

    » TABLE CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1 Relevance of project 1.2 Site inspection 1.3 Evolution of road network in nigeria 1.4 Motor vehicle characteristic that affects road design data 1.5 Drivers and their characteristics 1.6 Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7 Factors Affecting Choice Of Station C...Continue Reading »

    Item Type: Project Material |  50 pages |  4,876 engagements | 

  • 25. DELAY ANALYSIS IN INDUSTRIAL PROJECTS BY USING RELATIVE IMPORTANCE INDEX METHOD

    » TABLE OF CONTENTS Approval page Dedication Abstract Acknowledgement Table of content CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Ch...Continue Reading »

    Item Type: Assignment |  50 pages |  7,675 engagements | 


Searching makes things a lot easier.. Search for what you are looking for

What's your project topic?